Toronto Platform Condos | 31.09m | 9s | Sierra | Kirkor Architects

At the end of Sept I was told they were 90% sold. If that is truly the case the project should be starting soon.
 
According to the developer's site they are starting demolition this summer:

Despite no paid advertising and no sales office, Platform Condos is nearly sold out. Baker Realty ran the sales program for the mid-rise project, and demand was so high for new product on the Danforth, there was no need to run a marketing campaign. Demolition of on-site structures should start in the summer of 2018 and construction will get underway in the fall.

https://fortressrealdevelopments.com/projects/platform-condos/
 
There is a sign on the beer store that mentions they are closing March 18th. Looks like everything is on track for demolition in the summer.
 
Fencing up around the perimeter. I'd say demolition work is imminent.

IMG_20180404_181154.jpg
IMG_20180404_181152.jpg
 

Attachments

  • IMG_20180404_181154.jpg
    IMG_20180404_181154.jpg
    220.8 KB · Views: 764
  • IMG_20180404_181152.jpg
    IMG_20180404_181152.jpg
    195.1 KB · Views: 756
As of Jun 29th, they've moved around a lot of dirt on this site, made some nice dirt piles, put in some pilings around the perimeter, and dug this hole. Wouldn't say things are moving swiftly.

IMG_20180629_154520.jpg
 

Attachments

  • IMG_20180629_154520.jpg
    IMG_20180629_154520.jpg
    348.9 KB · Views: 716
The entire site has now been mostly excavated. Not very deep however. Only one level of parking??

IMG_20180802_172031.jpg
IMG_20180802_172023.jpg
IMG_20180802_172008.jpg
 

Attachments

  • IMG_20180802_172031.jpg
    IMG_20180802_172031.jpg
    243.7 KB · Views: 1,002
  • IMG_20180802_172023.jpg
    IMG_20180802_172023.jpg
    257.7 KB · Views: 976
  • IMG_20180802_172008.jpg
    IMG_20180802_172008.jpg
    253.4 KB · Views: 965
The entire site has now been mostly excavated. Not very deep however. Only one level of parking??

View attachment 152241 View attachment 152242 View attachment 152243

According to the builder's site it is 2 levels (65 parking spots):

65 vehicular parking spaces, 115 bicycle parking spaces, and two levels of below-grade parking.

https://fortressrealdevelopments.com/projects/platform-condos/

However it does look too shallow for 2 levels. I'm assuming they are going deeper unless the equipment has already been removed?
 

Back
Top