Jeff Morgan
Active Member
It was a sunny morning this morning so I grabbed a picture
It was very sunny this morning. Here are a couple of the north side that are being illuminated by the reflection from the Royalbank tower(s).
And also a few to the right of Pinnacle out to the Leslie St spit where it looks like there is a movie shoot.
I would say they are about 10m-12m down and 8m-10m to go. I presume they’ll go down to the same level as phase 1. Here is a pic from Oct 2018, from page 183 of this thread, posts around 2730 and later. Have a look at the posts from that time for comparison.We love to see it! Approx. how many levels do we think the dig is so far, and how many more to go?
New ramp on north side and some freshly uncovered old footings on the south side.
View attachment 303350
The main action is likely taking place in the construction of the first building. As the development for the one under excavation is waiting on that one to be completed more or less. So perhaps they are in not really in a rush big hole side?Site actually looks pretty quiet for such a big excavation/building
Would those have been footings for an old pier? It is amazing just how much we have pushed out the shoreline from its original location.New ramp on north side and some freshly uncovered old footings on the south side.