Toronto Parliament Street Data Centre | ?m | 5s | BRL Realty | WZMH

Thanks for the pics - from looking at the rendering it appears that the metal structure is the top floor. Yes?

They now seem to be making good progress on the eastern side of the building, forming up 2nd concrete floor.
 
…and here's the evidence of work on the east side:

P1390667.jpg


P1390671.jpg


42
 

Attachments

  • P1390667.jpg
    P1390667.jpg
    97.8 KB · Views: 2,149
  • P1390671.jpg
    P1390671.jpg
    94.1 KB · Views: 2,169
That's one immobile pickup!

42
 
I was there late on a Saturday afternoon. I'm going with the former!

42
 
I've always been puzzled why one part of a building, typically the top floor, is completed with steel rather than concrete (e,g., rogers at Isabella and Jarvis; teachers building on Isabella).
 
Yesterday:

IMG_20140723_141158.jpg



IMG_20140723_141251.jpg



IMG_20140723_141430.jpg



IMG_20140723_141535.jpg
 

Attachments

  • IMG_20140723_141158.jpg
    IMG_20140723_141158.jpg
    95.3 KB · Views: 993
  • IMG_20140723_141251.jpg
    IMG_20140723_141251.jpg
    96.5 KB · Views: 1,000
  • IMG_20140723_141430.jpg
    IMG_20140723_141430.jpg
    92.2 KB · Views: 1,005
  • IMG_20140723_141535.jpg
    IMG_20140723_141535.jpg
    91.5 KB · Views: 1,019
This building will be about how good that cladding ends up looking. There sure will be a lot of it!

42
 
Well, it's going to be pretty ephemeral…

42
 

Back
Top