Mississauga Parkside Village Residences | 135.93m | 45s | Amacon | Richmond Architects

Looks like all three buildings will be built basically at the same time.

Phase 1 and 2
http://www.dailycommercialnews.ca/cgi-bin/top10.pl?rm=show_top10_project&id=9f1077baf0081ccbfb714bd1ff1fef7f48f09e1d&projectid=9058146&region=ontario

CONDOMINIUM TOWNHOUSES, RETAIL & OFFICE SPACE Proj: 9058146-14
Mississauga, Peel Reg ON NEGOTIATED/START
Grand Residences of Parkside Village, Phases One and Two, 465 Burnamthorpe Rd W, Confederation Pkwy, L5A
$90,000,000 est
Start: April, 2010 Complete: April, 2011
Note: All Sub trade pricing is secured.
Project: concrete foundation, cast-in-place concrete structural frame, fuel fired heating system, proposed construction of a mixed-use development. Phase One includes a 36 storey tower with 584 units and Phase Two includes a 45-storey tower with 900 units. A four storey podium will connect the towers with a landscaped terrace and roof-top amenity space. Also proposed for the site is construction of a seven storey podium building in the northeast quadrant of the site for 52,000 sq ft of office space, 30,000 sq ft of retail space is proposed along the north, east and south frontages of the site and a 25-storey residential tower with 450 units and an additional 7-storey podium building will be built adjacent to the southeast building.
Scope: 910,000 square feet; 36 storeys; 2 storeys below grade; 5 structures; 1934 units; parking for 1280 cars; 32 acres
Development: New
Category: Apartment bldgs; Retail, wholesale services; Commercial offices

First report Fri Feb 23, 2007. Last report Wed Apr 07, 2010.
This report Mon Oct 25, 2010.


Phase 3
http://www.dailycommercialnews.ca/cgi-bin/top10.pl?rm=show_top10_project&id=66df61b13b494c4f75bebac66a01cc511f79e625&projectid=9072406&region=ontario
CONDOMINIUM APARTMENT BUILDING, TOWNHOUSES Proj: 9072406-16
Mississauga, Peel Reg ON NEGOTIATED/PLANS COMPLETE
Grand Residences of Parkside Village, Phase Three, 465 Burnhamthorpe Rd, Confederation Pkwy, L5B
$20,000,000 est
Start: January, 2011 Complete: March, 2012
Note: Construction schedules for this project have changed. Gen Cont expects Sub trade tenders will be issued December, 2010. Construction is anticipated early 2011 based on construction of phases One and Two, report number 9058146. Further update December, 2010.
Project: concrete foundation, cast-in-place concrete structural frame, fuel fired heating system, Proposed construction of a 36-storey tower with 584 units and retail at grade and three storey condominium townhouses.
Scope: 260,000 square feet; 36 storeys; 1 storey below grade; 2 structures; 584 units
Development: New
Category: Apartment bldgs; Retail, wholesale services; Restaurants
First report Wed Oct 17, 2007. Last report Tue Aug 31, 2010.
This report Mon Oct 25, 2010.
 
Phase one and two are scheduled to be complete April 2011? Surely that must be a mistake.

Edit: Also, whats with all the proposed buildings inside the timeline for the buildings already under construction?
 
Last edited:
Phase one and two are scheduled to be complete April 2011? Surely that must be a mistake.

VDUB can confirm but my guess would be that April, 2011 is when the project will be at ground level. Tower 1 (36s) won't be ready until the end of 2012 and tower 2 (45s) won't be ready until spring of 2013.
 
from today...
20101028021.jpg
 
VDUB can confirm but my guess would be that April, 2011 is when the project will be at ground level. Tower 1 (36s) won't be ready until the end of 2012 and tower 2 (45s) won't be ready until spring of 2013.

I don't know dates at all but I think I should be at ground level sooner than April...

Second crane should be going up in the next coupla weeks...

I did find out that my crane is actually just doing the podium and the 45 story building crane won't be up till the new year...

It'll hopefully be around the time that I finish my portion so that they can just move me over...
 
I should see much more action on my side (N crane) in the new year...

The builder really wanted to push the slab on grade and first deck for the bottom floor by the Christmas break...
 