Hamilton Parkland Ancaster | ?m | 3s | Shannex

Branden Simon

Senior Member
Member Bio
Joined
Apr 30, 2018
Messages
1,387
Reaction score
4,319
Location
Hamilton
Parkland Residences on 558 Golf Links Road. This building is under construction. With an all 3 story buildings with First building 128 unit Memory care home, Second Building will have 76 unit retirement homes, and third building will have 96 unit apartment building.

Renderings from parkland
7D8C90B8-869C-4D30-8131-F08A49DDED0D.jpeg
EBA2D368-2AC6-4010-B251-D33C9A75662C.jpeg
0AFC34DA-5ED0-49FB-98DF-C9E418E0150F.jpeg
 
Parkland is a large Nova-Scotia based retirement home developer and operator - I believe this is their first project in Ontario.
 
Parkland is a large Nova-Scotia based retirement home developer and operator - I believe this is their first project in Ontario.
Parkland Retirement Living has 2 current locations in Ontario with third location Parkland Ajax opening on February 1 and fourth location Parkland Ancaster scheduled opening for 2024 or 2025
 
Parkland Retirement Living has 2 current locations in Ontario with third location Parkland Ajax opening on February 1 and fourth location Parkland Ancaster scheduled opening for 2024 or 2025
Parkland is a large Nova-Scotia based retirement home developer and operator - I believe this is their first project in Ontario.

Parkland's Eglinton and Kipling location opened in Etobicoke in 2021.


42
 
Parkland Retirement Residents in Ancaster Construction update (Photo’s has been shot this month).
-Building 1 Supportive Living Housing has been topped off
-Building 2: All Inclusive Lifestyle building A fourth floor installed and roofing work is underway
-Building 3 Lifestyle Apartments first floor installation is underway
An Information Session is planned for Parkland Ancaster is on June 28 Times 10:00am & 2:00pm for Independent Lifestyle Option Information Session and 6:00pm for Assisted Living, Memory Care & Enriched Care Options Information Session at Carmen’s Banquet Centre in Hamilton

2F439B96-8106-4009-B940-6468A550D14C.jpeg
2D40ADBC-38B2-472D-8D3C-9403FC7A7B48.jpeg
 
the part of this next to the 403 has been sitting half-built forever with little to no movement. The exposed wood structure has started fading from the sun it's been sitting so long.
 
Yes I should have taken more photos (getting the stare down from construction crew) , thinking that it must be a cash flow thing as the two buildings that are nearing completion look to be near finish line.
 

Back
Top