Toronto Park Lawn GO Station | 12.83m | 2s | First Capital | Hatch

The track record of TOD isn’t great…. Ford announced Woodbine in 2017 with great fanfare, and it has ‘t happened. Mimico also received lots of fanfare. But beyond the immediate bounds of the Mimico project, a lot of densification is moving forward. So I would think that QP will just try to keep the project moving and keep the volume low until somebody does get the work done.

- Paul
2017? Man wasn't even Premier yet then.
 
Why can't it be? Not all trains have to stop at every stop (note the 4-track corridor in this location). Also, not all people travelling from Oakville are heading downtown. What if someone wanted to visit a friend in one of the condos at Park Lawn? Or maybe they live in Burlington and work at the Ontario Food Terminal? Or are they coming from Whitby and want to visit Humber Bay Park and Bike the Humber River trail? these trips would have all been impractical by transit before, but with this stop, it will be quite possible and probably more attractive than driving. these examples are specific to Park Lawn, but I'm sure similar examples can be made at any of the new stations. Imagine the following service pattern on LW,
  • Express trains every 20 minutes, skipping Long Branch, Mimico and Park Lawn
  • Local trains every 10 minutes, all stops from Oakville

That seems to serve everyone's needs pretty well; you get your fast train to Toronto, and others get served by the transit they need.

that's pretty much exactly how it works in Berlin and it works beautifully.

4 track corridors
2 tracks are dedicated to S-Bahn service (10 minutes all day)
2 tracks are dedicated to Regional & Intercity (ICE) service.

dividing the two services (local & regional) is so simple to understand and use. it just makes so much sense. someone travelling from Hamilton doesn't want or need to stop at every station. said person could always transfer to a local service at an interchange station if needed. the user experience is enhanced for both services when both are offered and clearly defined.
 
no updates eh

it's being built with phase 1 of 2150 Lake Shore. Part of that phase is the new street which is currently undergoing an EA for the rail underpass and that one will be submitted to the city in the fall.... and THEN they do 30% design for the road

soooo

it feels like we're still at least 1-2 years away just for the whole 2150 project to get started at minimum.
 
it's being built with phase 1 of 2150 Lake Shore. Part of that phase is the new street which is currently undergoing an EA for the rail underpass and that one will be submitted to the city in the fall.... and THEN they do 30% design for the road

soooo

it feels like we're still at least 1-2 years away just for the whole 2150 project to get started at minimum.
Good points above. Also new condos are not selling, so might be a while before they can start on Phase 1.
 
Mods - Not sure if there is good reason for continuing a separate thread on this station, as opposed to being part of the GO Construction discussion?

Anyways, it seems there are shovels starting work on this station.

- Paul

1721581147950.png
 
Mods - Not sure if there is good reason for continuing a separate thread on this station, as opposed to being part of the GO Construction discussion?

Anyways, it seems there are shovels starting work on this station.

- Paul

View attachment 582110

FWIW, I don't see any sign of permit applications for the new station.

Strictly speaking Mx does not need to apply for them; but generally, they do, its a cheap second set of eyes from the City on their contractors.
 

Back
Top