According to a diagram in the sales material, the outdoor parking will be located toward the street end (north end) of the property at its east side, which is also the front-facing side of the building. The ramp down to undergroud parking will be closer to the rear (south end), also on the east side, as can be seen in Asmegin's good pictures. I'm no expert but the pace of construction seems acceptable so far, to me. The basement is always slowest.
I continue to wonder if this thing will seem oversized, given the huge-sized footprint in relation to the height, but we'll hope for the best. It will represent some welcome intensification in this mainly low-density area.