AlvinofDiaspar
Moderator
From the Feb WT Board Meeting CEO Report:
Ontario Place/Exhibition Place Bridge Pre-Engineering & Costing Study
At the request of the City of Toronto, Waterfront Toronto has initiated a feasibility study of replacing the existing pedestrian bridge that connects Ontario Place and Exhibition Place with a much wider “land bridge”. Waterfront Toronto has completed a procurement process and retained DTAH and MMM to undertake the feasibility study, with all costs covered under an agreement with the City.
Deliverables from the study will include: a site conditions report, including phase one archaeology; design concept options for three different bridge widths; and preliminary cost estimates. The goal of the study is to determine whether or not the idea of a “land bridge” should continue to be included as the Province continues to consider options for the revitalization of Ontario Place. The study is expected to be completed by March 2017 for consideration in the upcoming Provincial budget.
http://waterfrontoronto.ca/nbe/wcm/...EO+Report+-+February+10,+2017.pdf?MOD=AJPERES
AoD
Ontario Place/Exhibition Place Bridge Pre-Engineering & Costing Study
At the request of the City of Toronto, Waterfront Toronto has initiated a feasibility study of replacing the existing pedestrian bridge that connects Ontario Place and Exhibition Place with a much wider “land bridge”. Waterfront Toronto has completed a procurement process and retained DTAH and MMM to undertake the feasibility study, with all costs covered under an agreement with the City.
Deliverables from the study will include: a site conditions report, including phase one archaeology; design concept options for three different bridge widths; and preliminary cost estimates. The goal of the study is to determine whether or not the idea of a “land bridge” should continue to be included as the Province continues to consider options for the revitalization of Ontario Place. The study is expected to be completed by March 2017 for consideration in the upcoming Provincial budget.
http://waterfrontoronto.ca/nbe/wcm/...EO+Report+-+February+10,+2017.pdf?MOD=AJPERES
AoD