Toronto Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

I took a few quick pics yesterday
20240704_182947.jpg
20240704_182957.jpg
 
There is a FB post from the manager of the Argos expressing concern about fan safety. Last night both an Argos game and a Budweiser concert let out at the same time resulting in severe crowding in the tunnel, on the bridge and on the GO platform.

Just a little thought: as the station is under construction and this likely won’t be a problem in a year is there an option to stagger events by a bit? Even 20 minutes spread would probably reduce flow enough. Also how many patrons are going to the streetcar and Dufferin loops? Can organizers dream up a way to get more people to use them?
 

Back
Top