Dan416
Senior Member
Rob MacIsaac's response to my letter about the DRL:
Frankly I think waiting 2 or 3 years is an interminable delay. The DRL is needed NOW. The EA should be started NOW.
I think I should reply and restate that I think the DRL should be a first priority and put in the 10-year time-frame.
EDIT: By the way, Rob MacIsaac is the only one to reply to my email so far. Neither Bonnie Crombie, MP or Bob Delaney, MPP have replied.
Mr. Perz:
Thank you for your email on the Downtown Relief Line and your interest in making it a priority project for the Greater Toronto and Hamilton Area (GTHA) transit services.
The Big Move is fundamentally about building an integrated, regional transportation network. As such, an important part of the process was identifying projects that made a significant contribution to a regional network. The regional significance of individual projects was assessed by rating each based on seven general criteria. Based on our assessment, the Downtown Relief Line is a project of regional significance and is therefore included in the Big Move.
Metrolinx approaches its plan as a whole, integrated system. For example, the recommended creation of Express Rail along the Lakeshore and Georgetown GO lines with fast, frequent two-way, all-day service every 15 minute, with five minute service in peak hours, will positively impact not only the Yonge subway line, but numerous other lines as well. The complete 25-year, $50 billion plan totals over 60 new transit projects and identifies 15 priority projects. In analyzing the expansion of the existing subway system, Metrolinx considered the priorities set out by all transit operators in the GTHA, including GO Transit and the TTC.
In my view, we must continue to analyze in more detail and prioritize the 45 remaining projects. At the same time it is essential that we move forward as quickly as possible with the 15 priority projects. We have sufficient funds committed by the province of Ontario to begin building these priority projects. We will consider the DRL’s placement in conjunction with our first review of the Big Move which is anticipated to commence in the next two or three years.
Rob MacIsaac
Chair, Metrolinx
Frankly I think waiting 2 or 3 years is an interminable delay. The DRL is needed NOW. The EA should be started NOW.
I think I should reply and restate that I think the DRL should be a first priority and put in the 10-year time-frame.
EDIT: By the way, Rob MacIsaac is the only one to reply to my email so far. Neither Bonnie Crombie, MP or Bob Delaney, MPP have replied.
Last edited: