I had a meeting with TTC staff Monday night and this was said about the DRL:
"TTC needs to maximizes their system first before building this DRL and it must be push off into the distance future as far as possible."
One can say I don’t want this to happen on my watch as to the price tag of $2.1B. "It’s money that can be use for other things" by TTC staff.
So, one needs to changes some minds with TTC and the City to get the DRL 100 years after it first raise it's head.
Good plan. First, they will spend hundreds of millions trying to prop the Yonge line beyond its design capacity. Then, they will defer DRL until the system is absolutely unable to operate without it.
After that, they will try to operate in that condition for 8 or 10 years while DRL is being actually designed and built. That's the vision!
I am sure that the 800-million section from Steeles West to VCC (a route that does not even warrant a frequent bus service at present) is a better investment than the 2.1 B DRL (which will be only the third busiest segment on the entire system, behind the Yonge / Bloor - Union and St. George - Union segments).