Sounds like lines crayoned on a napkin.
I think you're giving him too much credit
Sounds like lines crayoned on a napkin.
Sounds like lines crayoned on a napkin.
I actually like diminutive's rail plan better then any subway, but with the foresight this region lacks, the subway may be the best option.
Hudak should know, he will start construction within 100 days of being elected.
Why are you saying this? Check what he said. He'd start an engineering study with 100 days of being elected.Hudak should know, he will start construction within 100 days of being elected.
Why are you saying this? Check what he said. He'd start an engineering study with 100 days of being elected.
Oh joy ... a study ...
Really, it would require 2-3 years of studies, borings, detailed design, and tendering. This dovetails in not building any of this stuff until the budget is balanced. Which is also why Eglinton won't be going ahead for some time.Right, so he promises to follow through on the current plan Metrolinx and TTC have in place to perform a joint study. This is good but also the "no change" option.
Really, it would require 2-3 years of studies, borings, detailed design, and tendering. This dovetails in not building any of this stuff until the budget is balanced. Which is also why Eglinton won't be going ahead for some time.
In the mean time, look for 3/4 TBM to do a single bore in place of the current 2 bore around the world to be on hand for the start in Jan 2016
Depending on the length of each bore as well where it is, we can see the first phase from downtown to Danforth up and running by 2021/23, Eglinton by 2025, Sheppard by 2027, Finch by 2029 and Steeles by 2031.
Quick 6 month study and completed by Feb 2015. Start digging 3 launch shaft by June 2015 to start tunneling in 2016.
In the mean time, look for 3/4 TBM to do a single bore in place of the current 2 bore around the world to be on hand for the start in Jan 2016. TBM 1 will be remove from launch shaft 2 once it reach it and be move to launch shaft 4. The other TBM's will be doing the same thing as more launch shaft are built. This will cut tunneling time in almost haft.
Depending on the length of each bore as well where it is, we can see the first phase from downtown to Danforth up and running by 2021/23, Eglinton by 2025, Sheppard by 2027, Finch by 2029 and Steeles by 2031.
Need to do a few sole source contracts for liners and various items with some contracts for the main work as well.
Oh!! I am dreaming in some fool mind where we will not see anything done until the next election. Wake me up when the next election rolls around as I will haven't miss much other than not having to see this joker make a mess in real time.
Aren't all of the TBMs custom made? I don't think that it would be likely that we'd find an unused TBM that would meet are specific needs.
Nothing on the west side to Bloor? And previous ML documents have indicated that a 2024 opening date is possible for the RL. I don't know if that possible timetable has changed. I know that no final date has been set.
Quick 6 month study and completed by Feb 2015. Start digging 3 launch shaft by June 2015 to start tunneling in 2016.
In the mean time, look for 3/4 TBM to do a single bore in place of the current 2 bore around the world to be on hand for the start in Jan 2016. TBM 1 will be remove from launch shaft 2 once it reach it and be move to launch shaft 4. The other TBM's will be doing the same thing as more launch shaft are built. This will cut tunneling time in almost haft.
Depending on the length of each bore as well where it is, we can see the first phase from downtown to Danforth up and running by 2021/23, Eglinton by 2025, Sheppard by 2027, Finch by 2029 and Steeles by 2031.
Need to do a few sole source contracts for liners and various items with some contracts for the main work as well.
Oh!! I am dreaming in some fool mind where we will not see anything done until the next election. Wake me up when the next election rolls around as I will haven't miss much other than not having to see this joker make a mess in real time.
I really thought you knew more about this stuff. If it was as simple as just extending a subway down Sheppard, maybe. But we don't even know WHERE the thing is going. And then you have to figure out HOW, which is going to be difficult downtown.Quick 6 month study and completed by Feb 2015. Start digging 3 launch shaft by June 2015 to start tunneling in 2016.