From yesterday morning, construction progress appears to be slower than I initially thought:

20241001_091223.jpeg
 
Update: A mobile concrete pump is on site and excavation equipment appears to be hauled away. I didn't get a look at what they where pumping concrete for, but I suspect it's a base for something way down in that pit...crane next? Stay tuned to this Bat-Channel...
 
...they're definitely pouring something down there. All the surface to the east of the yellow circle there has been entombed.
 
...I wouldn't be surprised if they install the crane here this weekend.
 
Not sure if these have been posted before, but the DB is out of date. From the FCR website: https://fcr.ca/properties/ontario/toronto/yorkville/138-yorkville/

Does anyone know if this is rental or condo...I don't think I've ever seen a pre-sales campaign for this project. Would be quite unconventional to build it on spec and sell completed units.

Also, the file name of the brochure on the FCR website tells you who they're targeting for the retail tenant.