With long material lead times, often from overseas suppliers, I doubt much will change with the exterior build. For the interior communal areas, they might have some contractual flexibility.So I might be asking an obvious question or one that has been asked before, so I apologize in advance. But since the project has gone into receivership, does that in anyway affect the quality of the build, materials, finishes etc. as they are building at a loss essentially as I understand it (Im not very familiar w9th what that entails)
Im pretty sure you can see them installing the cladding at that section in @Johnny Au 's 7th photo abovewhy have they abandoned finishing the back of the elevator stack
If you look most loading platforms and that are located on the back of the building I believe in the reason this is being finished slower is to maintain access to the floorswhy have they abandoned finishing the back of the elevator stack