Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

The golden diagrid cladding I was pining for. ;-).

53744372421_001e0f59e9_h.jpg

The One (1 Bloor West) construction progress, as of May 24, 2024 by Jeremy Gilbert, on Flickr
 
I guess we are going to have to start seeing it go up the same way everybody else does by watching the forms bloor you have been an absolute treat for following this project here is hoping that they don't hit pause and we get this building continuing to go up as sky Tower is gaining on it quick
 
I guess we are going to have to start seeing it go up the same way everybody else does by watching the forms bloor you have been an absolute treat for following this project here is hoping that they don't hit pause and we get this building continuing to go up as sky Tower is gaining on it quick

Do you have a source on the budget being approved till 62 floors, @Collingwoodbuildinglover ?

If so, then Skygrid built a very small number of floors after taking over from Mizrahi as GC.
 
Do you have a source on the budget being approved till 62 floors, @Collingwoodbuildinglover ?

If so, then Skygrid built a very small number of floors after taking over from Mizrahi as GC.

AFAIK there have been no changes from the court approved Reconfiguration Plan (88 additional units between floor 62 and 81), which builds up to floor 85.

As a reminder from Steveve's post:
Under the Reconfiguration Plan, the Upper Levels will be reconfigured as follows:
(i) levels 62 and 76 will be modified from a four-Unit layout to a six-Unit layout;
(ii) levels 63 to 75 will be modified from a four-Unit layout to a ten-Unit layout; and
(iii) levels 79 to 81 will be modified from a two-Unit layout to a four-Unit layout.
This would increase the total amount of units from 415 to 503.


 
Last edited:

Back
Top