got it right
Active Member
Excellent pics. Thanks for the update. This is an exciting project, can't wait to see the excavation start.
Looks like that street hasn't been paved in years, i can bet that not 1 cent of section 37 funds will go into fixing it after this development is done?
I would assume they would wait for all of the construction to be completed along this stretch before sinking hundreds of thousands into brick roadwork or repaving. Considering all of the heavy trucks rolling through. I am sure they have a good idea based on planning documents when this street will be fully redeveloped.I always thought the plan was to do interlocking paving here (see https://torontoed.com/wp-content/uploads/2017/01/TEDBIA_StreetscapePaletteUpdate_Feb2014.pdf), but I don't know how this is supposed to be funded or if it will come into reality. I'd love to see these recommendations realized!
I would assume they would wait for all of the construction to be completed along this stretch before sinking hundreds of thousands into brick roadwork or repaving. Considering all of the heavy trucks rolling through. I am sure they have a good idea based on planning documents when this street will be fully redeveloped.
It was originally scheduled to be done this year - and as far as I can tell has now been deferred until at least 2021.