Toronto Neon Condos | 49.98m | 20s | Pemberton | Graziani + Corazza

January 10th:

0NVg9.jpg


Gt9Ok.jpg


Lf6FP.jpg
 
Was talking to the owner next to this site and he has water issues as well a crack basement wall withe the developer not prepare to do anything about it.

There is only 4 feet between his place and the new tower with the area on a slope toward his house.

Since one of the 2 owners north of this house wasn't prepare to sell, the developer didn't offer to buy his.

Tower crane can be erected anytime as the footing is in place.

May 4
8716556359_3af0e6846b_b.jpg


8717676332_174ab7a5e6_b.jpg


8716558865_b4a63c1b33_b.jpg
 
sorry to bring this back from the dead so to speak, but who is the architect for this? the database listing says G + C, but the thread says HP.
 
sorry to bring this back from the dead so to speak, but who is the architect for this? the database listing says G + C, but the thread says HP.

if it going to resemble the render the honour belongs to those faux architects G+C.

they always have a few hundred thousand pieces of deeply discounted mullion laying around for their next craptastic spectacle, and this seems to be it.

also they have some balcony glass left over from Aura, so they are also going to throw that on there too.
 
From September 14th

neonsept14.4.jpg


neonsept14.3.jpg


neonsept14.2.jpg


neonsept14.1.jpg
 

Attachments

  • neonsept14.4.jpg
    neonsept14.4.jpg
    95.7 KB · Views: 686
  • neonsept14.3.jpg
    neonsept14.3.jpg
    97.6 KB · Views: 699
  • neonsept14.2.jpg
    neonsept14.2.jpg
    97.7 KB · Views: 675
  • neonsept14.1.jpg
    neonsept14.1.jpg
    97.7 KB · Views: 687

Back
Top