Toronto MuseumHouse | 71.01m | 19s | Yorkville Group | P + S / IBI

10 March 2009 photo update

Still waiting for equipment?

dsc00890v.jpg


Solid team here I suppose:

dsc00893j.jpg
 
nice progress ... how deep is this one supposed to be?
does MH abutt the building next door bc i thought the model/floorplans showed windows all around ?
 
Last edited:
Development application (p2) says:

A total of 45 parking spaces are proposed in five underground parking levels, to be accessed through the use of a car elevator. No visitor parking spaces are proposed.



nice progress ... how deep is this one supposed to be?
does MH abutt the building next door bc i thought the model/floorplans should windows all around ?
Yeah, the application diagram shows that most of the first 9 floors will be blocked by the building next door on the west side.
 
Last edited:
6 floors down. Sweet, that should give me enough time to save up for one of these units ..................

IIRC, correctly - the renderings show this one as if it were standing by itself in some park with only the ROM for company. The east/north/south sides have windows. Although the east side will eventually be facing directly at the planned Bazis project.
 
May 12th Update

... A little deeper :)

Click on the thumbnail to enlarge, then click again on the image for full size.

 

Back
Top