Mississauga M4 at M City | 215.6m | 67s | Rogers Real Estate | Core Architects

I think they are pouring the base for a crane(s). But not sure they are using the most efficient method - pouring concrete into buckets ( including an excavator’s) then driving them down the pit. I imagine the cement trucks may not be able to climb the steep ramp.

IMG_4434.jpeg
 

Back
Top