I reiterate one salient point about the winning scheme: it's clearest in accounting for the "minor" heritage, like the little bank building S of Keating Channel...
 

syn

Senior Member
Member Bio
Joined
Apr 26, 2007
Messages
5,346
Reaction score
3,637
I liked this proposal the best, but overall I found it hard to believe there weren't better proposals out there.
 

syn

Senior Member
Member Bio
Joined
Apr 26, 2007
Messages
5,346
Reaction score
3,637
West8's plan was the most realistic... so realistic in fact that it is being implemented just one short year after it was commissioned.

I think that the wavy boardwalks and plenty of timber will be a Toronto signature just as much as is the CN Tower and the SkyDome.... which reminds me.. thank gawd they ditched the kitchy Maple Leaf in the harbor.

Did they? They still seem to be a part of the plan in the link GB posted in the other thread (which is where the Leafs should probably be discussed).
 

unimaginative2

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
4,554
Reaction score
9
Location
New York
This is the most exciting part of the waterfront. I'm really hoping that the Keating Channel area turns out as well as I'm imagining. It could be a real centrepiece of the waterfront.
 

smuncky

Senior Member
Member Bio
Joined
Jun 30, 2007
Messages
1,878
Reaction score
1,112
i saw all the phases that this has to go through before actual buildings and infrastructure begins to get built. does anyone know the timelines for those phases or just in general how long this will take?
 

AlvinofDiaspar

Moderator
Member Bio
Joined
Apr 22, 2007
Messages
32,538
Reaction score
27,195
Location
Toronto
I was at the open house earlier today and the MVVA alternative is the preliminary preferred alternative. Pending further studies, it should be ready for submission by the end of the year.

AoD
 

EnviroTO

Senior Member
Member Bio
Joined
Apr 22, 2007
Messages
4,680
Reaction score
1,891
Location
Yonge & Mt.Pleasant
I was at the open house earlier today and the MVVA alternative is the preliminary preferred alternative. Pending further studies, it should be ready for submission by the end of the year.

What have they been doing since last May when the MVVA plan was selected? By the end of the year? Seems like they are really taking their time.
 

AlvinofDiaspar

Moderator
Member Bio
Joined
Apr 22, 2007
Messages
32,538
Reaction score
27,195
Location
Toronto
What have they been doing since last May when the MVVA plan was selected? By the end of the year? Seems like they are really taking their time.

The EA process have to follow certain requirements - it requires alternatives to be evaluated, for one (plus public and stakeholder consultations). And keep in mind that MVVA did their proposal in 8 weeks - there is a lot of fine-tuning to do.

Actual construction won't start (at the earliest) in 2010.

AoD
 

EnviroTO

Senior Member
Member Bio
Joined
Apr 22, 2007
Messages
4,680
Reaction score
1,891
Location
Yonge & Mt.Pleasant
I always wonder about these EAs when the the preferred design is already known and miraculously the EA preferred option based on "completely unbiased" evaluation always leads to the preferred option.
 

scarberiankhatru

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
5,274
Reaction score
6
I always wonder about these EAs when the the preferred design is already known and miraculously the EA preferred option based on "completely unbiased" evaluation always leads to the preferred option.

Gotta burn through the funding somehow! God forbid one of these sorts of projects actually comes in under budget.
 