drum118
Superstar
Couldn't get shots from the east end of Commissioner St due to excavators blocking the view of the bridge today.
Either my eyes were doing a number on me, or the bridge is on an angle in the current setup looking at it from the east end in relationship of the new Commissioner St.
.Both sections are now joined for the next phase for welding the joints together. Movers are still under both bridges at the joint area.
Photos should be up in the next 24 hours as there are other photos on front of it that were shot first.
As a note, the new Commissioner St road from the new Cherry St is slopping down to match the existing level of the current Cherry St road. I guess that has to do with the existing roads for the existing business until the current Cherry St road is bury after the new one opens.
Either my eyes were doing a number on me, or the bridge is on an angle in the current setup looking at it from the east end in relationship of the new Commissioner St.
.Both sections are now joined for the next phase for welding the joints together. Movers are still under both bridges at the joint area.
Photos should be up in the next 24 hours as there are other photos on front of it that were shot first.
As a note, the new Commissioner St road from the new Cherry St is slopping down to match the existing level of the current Cherry St road. I guess that has to do with the existing roads for the existing business until the current Cherry St road is bury after the new one opens.