Couldn't get shots from the east end of Commissioner St due to excavators blocking the view of the bridge today.

Either my eyes were doing a number on me, or the bridge is on an angle in the current setup looking at it from the east end in relationship of the new Commissioner St.

.Both sections are now joined for the next phase for welding the joints together. Movers are still under both bridges at the joint area.

Photos should be up in the next 24 hours as there are other photos on front of it that were shot first.

As a note, the new Commissioner St road from the new Cherry St is slopping down to match the existing level of the current Cherry St road. I guess that has to do with the existing roads for the existing business until the current Cherry St road is bury after the new one opens.
 
Sept 3
My other camera with a better zoom in for repairs and no idea when it will be done as well a 2nd camera. Having issues with this camera and looks like the zoom as well that only 2 years old
51425150584_7dbe2c12b0_b.jpg

51424503816_47f6f4f165_b.jpg

51425266274_b57455086e_b.jpg

51425266174_e638a6f971_b.jpg

51425266044_7ff57be593_b.jpg

51423756437_898da6c184_b.jpg

51424502736_bb66c934d3_b.jpg

51424754323_029b8fd8ba_b.jpg

51424502506_ef25ee8125_b.jpg

51425487560_0ccbeb4387_b.jpg

51424502366_1454fb9b20_b.jpg

51423755882_05d84a5047_b.jpg

51424502206_86143df573_b.jpg

51425264884_45b9b83c61_b.jpg

51425264709_5394e4eb27_b.jpg

51424753493_87a243a464_b.jpg
 
Sept 3
Starting to work on Commissioner St coming off the new Cherry St
51425636530_48512619b8_b.jpg

51424651601_5ab17be4b3_b.jpg

51423904302_5e269446cd_b.jpg


The new River
51424651426_faf8e466af_b.jpg

51424651296_99e6d0bdc2_b.jpg


South Cherry St Bridge Location
51428240244_03a997892a_b.jpg

51426731567_fb377a6c11_b.jpg

51427485656_80e0a6c87b_b.jpg

51427727318_8a13e98d76_b.jpg

51428460990_8dbc05c681_b.jpg


New Cherry St Connection At Lake Shore
51428459895_abe510740e_b.jpg

51426729582_ac7278ed75_b.jpg

51427483721_0421c7a00d_b.jpg

51427483331_5efb3b287b_b.jpg

51427483036_38e70ac9b3_b.jpg

51428456200_95e557d010_b.jpg
 
Tried scrolling back- but was there an estimated completion date on New Cherry St. going active? They're making great progress, but we need that last bridge before Polson, right?
 
Tried scrolling back- but was there an estimated completion date on New Cherry St. going active? They're making great progress, but we need that last bridge before Polson, right?
They need 2 bridges for the south end, but only one on order that will be for the road. That bridge is supposed to be here this fall with the Keating channel one next spring.

The plan was to have the new Cherry St and Commissioner St open by the fall of 2022 that will have an impact on the south LRT bridge.

By right, the LRT should be place first off the barge like the Keating Channel and then the road bridge. Because the LRT bridge wasn't order for the south end and Commissioner St due to lack of funds, it will cost a lot more to install them when they show up. The south end will be in a few years, but Commissioners will not be until 2040 at this time.

The whole area is to be open by 2024 other than buildings waiting to be built.
 
An extraordinarily thorough look at this project, with extensive, original photos, by Jack Landau is up at BlogTo.

I highly commend it to others ( I know, who would have thought it, from BlogTO, amazing what happens when you hire writers/photographers with ability)

 
An extraordinarily thorough look at this project, with extensive, original photos, by Jack Landau is up at BlogTo.

I highly commend it to others ( I know, who would have thought it, from BlogTO, amazing what happens when you hire writers/photographers with ability)

Yes, it's a very good article with his usual great photos. It certainly sets a new standard for BlogTO contributors!
 
An extraordinarily thorough look at this project, with extensive, original photos, by Jack Landau is up at BlogTo.

I highly commend it to others ( I know, who would have thought it, from BlogTO, amazing what happens when you hire writers/photographers with ability)

Interesting, I might have missed something but it looks like based on the map linked in that update that there will no longer be any promontory park north? Or are they just saying that or won’t be ready for 2024 but will still aim to be completed shortly after?

It doesn’t feature at all and it was one of my favourite parts of the plan :(
C9F45BFD-92D9-4EB8-B494-9C8154948A73.jpeg
 
Interesting, I might have missed something but it looks like based on the map linked in that update that there will no longer be any promontory park north? Or are they just saying that or won’t be ready for 2024 but will still aim to be completed shortly after?

It doesn’t feature at all and it was one of my favourite parts of the plan :( View attachment 348706
I believe it is not funded at this time.
 
Few timeline updates on page 42.

All delayed 1-6months

-Debris and sediment management area
-Commissioners bridge and Don roadway
-Cherry st Realignment
-Commissioners st west to new cherry st

Also both river parks are well over budget.

Page 51
Key Decisions Due Date
page51image1811079632
page51image1811115840

City to advise on direction regarding the Harbour Lead Rail staying. Jun-21

Have we heard the decision?
 