Toronto Line 5 Condos | 113.99m | 39s | Reserve Properties | Arcadis

November 2nd
IMG-20201103-WA0021.jpg
IMG-20201103-WA0026.jpg
IMG-20201103-WA0019.jpg
 

Attachments

  • IMG-20201103-WA0020.jpg
    IMG-20201103-WA0020.jpg
    400.1 KB · Views: 347
Any signs of digging/excavation yet?
Shoring (the current stage) takes several weeks to a few months. This stage is necessary before excavation begins. They are currently forming below-grade walls that will be revealed as excavation gets going. Once those drilling rigs have gone all the way around the edge of the site, you should see digging begin.
 

Back
Top