drum118
Superstar
Part of the tunnel system wasn't extended, but 100% remove. That why the PPUDO roof was move so it could be place later near the old location since there will be no cars around it like before. The old driveway was rebuilt with the east section on about 45 angle to the west of the PPUDO.Yes, there's a tunnel that runs to the terminal. If you remember how the station was originally laid out with the tunnel and stairs up to the old Kiss n Ride, that tunnel got extended.
The n-s tunnel remain as is as well to the old Subway Cr stairs. Those tunnels were upgraded as well waterproof before being cover over. A new tunnel was built to the new location of the PPUDO from the Hub and then to the N-S tunnel. NFITZ map show the location of the bend. Surprise Google got the bend right. since it underground now. From what I saw and not sure if it right, but the tunnel dips going toward the HUB. Will know better when I get the chance to use it in 2021 after it is finish.