AlvinofDiaspar
Moderator
I remember there being a doc that colour-coded Stages 1-3 (or 4?). Might have been for the design portion of the terminal.
There was a phasing plan for the terminal portion of the project in the competition booklet submitted by KPMB/West 8:
AoD
Attachments
Last edited: