This site digging going very slow...
compared to? I'd say it's incredibly fast, overallThis site digging going very slow...
Compared with other regular sites.compared to? I'd say it's incredibly fast, overall
Compared with other regular sites.
most of them by now after 2 months + one would see at least 1/4 deep already.
1/4 deep of one but i am seeing that is just a lot of cement and rods to deal with so we're good.Would that be 1/4 deep for a one level down excavation, a two level down excavation, or more? Compared to what kind of site considerations - a green field site compared to one with a pre-existing structure and basement which has to be excavated out? Would it be a site which has adequate staging and access areas above ground, or a lot-line to lot-line site?
Please tell us - most interested in how would you define a 'other regular site'?