Toronto Highland Creek Treatment Plant Contract 2 Project | 10.03m | 2s | City of Toronto | CH2M Hill

artyboy123

Senior Member
Member Bio
Joined
Feb 1, 2021
Messages
2,287
Reaction score
6,838
Location
Midtown
Taken from DevApp:

"Site Plan Approval to facilitate the construction of the new Northeast (NE) Plant, a 110 ML/d conventional activated sludge treatment plant, a new high-voltage substation, modifications to the Southwest (SW) and Northwest (NW) Plants that will provide long-term rehabilitation, and site preparatory work associated with the long-term plan for the Southeast (SE) Plant."

DevApp Link: http://app.toronto.ca/AIC/index.do?folderRsn=cFWEP2iGFg+dFjDCXDl40w==

Renderings are taken separately from the following documents "Renderings or Perspective Drawings" via Site Plan Approval:

PLN - Renderings or Perspective Drawings (1 of 2) - MAR 21  2022-1.jpg


PLN - Renderings or Perspective Drawings (1 of 2) - MAR 21  2022-3.jpg


PLN - Renderings or Perspective Drawings (1 of 2) - MAR 21  2022-5.jpg


PLN - Renderings or Perspective Drawings (2 of 2) - MAR 21  2022-2.jpg


PLN - Renderings or Perspective Drawings (2 of 2) - MAR 21  2022-4.jpg


PLN - Renderings or Perspective Drawings (2 of 2) - MAR 21  2022-6.jpg
 
The city should be providing at least semi-regular updates of what's happening on a multi-million dollar work site when it's not visible to the public. Even just once every few months as opposed to never would be nice.
 