ProjectEnd
Superstar
They’ve started back on the boring, gray, panels again. Hurrah?
Don't be so harsh. They cover up the greyness of the concrete.They’ve started back on the boring, gray, panels again. Hurrah?
Invitation for graffiti artists for sure.Don't be so harsh. They cover up the greyness of the concrete.
They’ve started back on the boring, gray, panels again. Hurrah?
View attachment 498997
They’ve started back on the boring, gray, panels again. Hurrah?
They are working on those elements too - at least the pieces that precede actual park construction. There's a large storm pipe that runs along the line of the old tracks that's getting trenched and installed now (the big, black, pipe segments are visible in my photo), and work on the bridge over Dupont is now underway. ~20 feet of fill has been added north of the North Toronto bringing grading up to the point where the path will exit onto Davenport. Lots of work on the whole project going at once, it's certainly not being held up by some shitty gray panels.They may be boring, but at least they're back to work. The sooner they're done, the sooner the rail path and landscaping work can start. (Or at least not be delayed.)
I like to think that the panels can have an art pieces installed on top if funding and wellness partners come forward.They’ve started back on the boring, gray, panels again. Hurrah?
View attachment 498997
They are working on those elements too - at least the pieces that precede actual park construction. There's a large storm pipe that runs along the line of the old tracks that's getting trenched and installed now (the big, black, pipe segments are visible in my photo), and work on the bridge over Dupont is now underway. ~20 feet of fill has been added north of the North Toronto bringing grading up to the point where the path will exit onto Davenport. Lots of work on the whole project going at once, it's certainly not being held up by some shitty gray panels.
Quite the opposite, unfortunately. "Art" was actively cut from the project's budget. Yay...I like to think that the panels can have an art pieces installed on top if funding and wellness partners come forward.
Yes but it could be organized by the community in the future. Metrolinx wouldn't care if they don't have to pay for it.Quite the opposite, unfortunately. "Art" was actively cut from the project's budget. Yay...
Artist, neighbourhood residents fuming over cancellation of mural for Davenport Diamond rail bridge
Fifteen months after Metrolinx announced it had awarded the commission of a $4-million record-breaking mural to Alex McLeod, the transit agency quietly cancelled the piece in an effort to rein in costs.www.thestar.com
4 Domes (3 Domes and 1 Park, technically...) usually means a rake of 20 carriages. What's so weird about this is it's the first time I've ever seen The Canadian coming in southbound on the Newmarket. I believe something was up on the Bala which is how it normally comes back into the City. What gets me now is how will they flip it back? @smallspy or @crs1026 are probably our best sources for that kind of speculation...I magnified the above substantially and its still hard to get a completely accurate car count on that consist.
@smallspy ; @crs1026 or @Urban Sky might have some insight into what appears to be the longest VIA consist I can remember. Its certainly well north of a dozen cars.
4 Domes (3 Domes and 1 Park, technically...) usually means a rake of 20 carriages. What's so weird about this is it's the first time I've ever seen The Canadian coming in southbound on the Newmarket. I believe something was up on the Bala which is how it normally comes back into the City. What gets me now is how will they flip it back? @smallspy or @crs1026 are probably our best sources for that kind of speculation...