Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

The standards used when that building was built never exist that are require today. It was built for freight trains like most buildings decades ago.
1800 Davenport was just built very recently - around 2018. It's all industrial/commercial, so fewer requirements for setbacks or crash walls (from what I understand...)
 
And the very first ‘bridge’ elements are up!
60998D9C-2308-4D8D-A203-5E5BBEACE5E7.jpeg
 
Enough room under the bridge for 4 tracks.

What will the locals say about this now as there is something showing how high the line will be at the highest point??
 
Fear mongering? From these folks? Surely you jest!
View attachment 361465
Forgot that the trees planted would have grown bigger by the time the graffiti would have been ignored. Hopefully, they'll include coniferous trees, not just deciduous trees.
 

Back
Top