Girders are arriving.
I know it was mentioned earlier so forgive me as I can't find it, but how many supports (or sets) are being built?
According to this document, there are 29 piers being constructed. I'm not sure if #29 is a golf tee pair or the south/north pier of the bridge over the CP line.
Edit: a subsequent document says 27 pier sets. I guess the 29 figure included the pier abutments at either end.
- Paul
but then this image shows Pier Set 1 and Pier Set 29 before the abutments:
View attachment 359744
so ... there is either 54 or 58 total piers, depending what part of the document you read.
Oddly enough though, P29 in that diagram is pointing at this:
I was really curious what it was like too. There's still a pedestrian underpass under the line on Dunraven Drive to Bert Robinson Park, though the design is different.
Kind of sad to see that the old Paton Rd. underpass that has been sealed off for decades has finally been filled in. Mostly because I never had a chance to go through it. The future at-grade tunnel under the tracks will be much nicer though.