SaugeenJunction
Senior Member
April 17
A lot of work has been done since my last visit that most of the new bus area been clean up along with landscaping on both side of the tracks. The stair from the walkway fully enclosed and nearing completion. All the steel is up on the new platform with about 50% with the roof on it.
The new elevator and stair way almost completed in the parking lot area. Curbs being install for the road to Hurontario as well the Transit bus road from the north side of the garage. More mesh has been installed on the garage.
By the looks of things, fall completion with some phase opening.
I counted 5 cars in the parking garage and 3 in the parking lot by the bus bay.
Looks like GO is putting all the FP's in service pushing 6 cars trains. Got to be well over a decade when I last saw FP's and 6 cars on the Milton line that were running hourly. Saw one train come in, but could see how many got off.
Metrolinx has posted signs for the elevators saying on 2 on it at any given time.
Lot more up on site.
What’s with the platform edge strip facing an earth embankment in this picture? Is it a provision for another track?