Markham Gallery Square | ?m | 16s | Remington Group | BDP Quadrangle

They’ve started to install some of the windows for the residential units!
CB20D79B-619D-45AD-A067-29263D1892EF.jpeg
 
New documents are in. These documents include changes for both Phase 1 (Western portion currently all above ground level) and Phase 2 (Which is the eastern portion that is not at ground level yet).
For Phase One, three changes were made:
  • The third floor retail concourse that spanned the entire podium for Buildings A and B has been removed and replaced with two levels of residential units, which resulted in a reduced retail area from 18,442 m2 (198,508 ft2 ) to 6,505 m2 (70,019 ft2 );
  • The height of Building C has been increased from 8 to 10-storeys;
  • The total residential units increased by 139 units for a total increase from 620 to 759 units, resulting from the reduction in retail area in Buildings A and B and increase in height of Building C.
For Phase Two, The Holding by Law that was in place because of Buttonville Airport having to approve and pass all building heights around Markham Centre is able to be removed after the developer meets a few planning requirements. Here are the changes to Phase Two with that:
  • The total Gross Floor Area of retail and restaurant uses has been slightly reduced from 563 m2 (6,060 ft2 ) to 557 m2 (5,995 ft2 );
  • The height of Building E has been increased from 27 to 30-storeys;
  • The total residential units increased from 454 to 506 units, an additional 52 units, resulting from the increase height permissions
The building heights for Phase One is 16,16 and 10 storeys, while Phase Two building heights are now 25 and 30 storeys tall.
More information here: https://pub-markham.escribemeetings.com/filestream.ashx?DocumentId=47562
Screenshot (1124).png
Screenshot (1125).png
 
Is that site down to 2 cranes now?

42
In the first photo, you can see the two cranes on top of the towers next to Birchmount (Red and White Crane, and the Blue and White Crane). There is also that fully white crane closest to the camera working on the building to the east which makes it three cranes. There is also a red mobile crane, but that wouldn't add to the overall crane count.
 
Looks like sales for the "Galleria Towers" phase is starting soon. I'm seeing more marketing for its upcoming launch:



0402gallery-towers-addon.jpg
 
I apologize for the low quality of photos/lack of photos recently, but I believe there are currently four cranes on this project, if anybody could go out and verify this that would be great! Phase 2 Gallery Towers is progressing well, with Phase 1 continuing well with cladding installation.
AD74BFB4-CD29-49F8-89F3-3BA9F1855D91.jpeg
6A16D842-1DA4-4134-A080-CD8D4F7CD2C8.jpeg
 
From ConstructingToronto on IG:



Screenshot_20220817-112829_Instagram.jpg
Screenshot_20220817-112837_Instagram.jpg
Screenshot_20220817-112845_Instagram.jpg
 
From ConstructingToronto on IG:



View attachment 420953View attachment 420954View attachment 420955
I'm super excited to see this completed! Looks like the marquee building with DT Markham!

All the other ones have been smaller, I look forward to what fills in the retail space!
 