Markham Gallery Square | ?m | 16s | Remington Group | BDP Quadrangle

Looks like a collapsing/implosion of scaffolding holding up the forms. I suspect if one goes over, like dominoes, a whole bunch goes over...

...or a wormhole formed at that spot. Glad it didn't suck in our planet in the process if that being the case!

...
 
What the site looks like today.
46CECDA7-F93C-404A-9DC2-A38B339942B5.jpeg
55358958-8A0D-44FB-B404-43F757E513E8.jpeg
26307585-D928-4206-A8BE-3719561E4408.jpeg
4DDD95C6-F705-41DF-A129-9AB7AA1F8EEA.jpeg
EB2B6295-E114-4810-B406-D868B2831EEE.jpeg
0EAB75C8-EFBC-4119-918E-4BACA7673724.jpeg
EC6567F9-D098-4BD6-BC07-0F9A2261E85B.jpeg
25DFFF9C-86B9-403B-96ED-0ADF2AFB6027.jpeg
060E6DAD-5D99-42FA-9EFC-69C5FFBDD44A.jpeg
 
Last edited:
Everytime I pass by to take photos to share this project here, there is some good progress. What I do not understand, is what is going on, and how they are still able to continue construction all around the giant hole in podium. They have not even touched the hole from what I can see,
4B821630-8043-4E73-907C-56E87C28885F.jpeg
619BE0C0-0888-48C0-B970-B2AEE1E00D5D.jpeg
5DA900BB-8971-49CE-BCDB-CDDF393E77A4.jpeg
32800082-764F-49BA-97F0-863D7E38D5F9.jpeg
 
More of the scaffolding on the lowers levels have been removed, showing more of the transfer slab and how large the bottom floor is. Priestly Demolition is on site now so something can be finally done on the massive hole in the podium, which it seems like they are getting rid of any rubble and debris that is there right now.
0F01BF06-7BE4-4A5D-90D8-89BFB38F9D2B.jpeg
AF4C3AA8-0024-4ED9-BD07-9DCC483E3AAF.jpeg
7ADEEC57-B5B0-4E45-8FF2-7E60C48BC688.jpeg
2E0046EE-FFAF-4826-8944-199CF38EE63D.jpeg
98602E08-D6CA-4344-A909-A371128BEFB7.jpeg
125123A2-53AC-4CC0-99DE-AC0F4A873FD7.jpeg
7C0B81AB-FBC8-4E3C-B09E-40B5043F85D4.jpeg
DD7B2106-B053-4AAF-9983-A2F8638F77ED.jpeg
 

Attachments

  • 8F9528BC-20E5-4F91-90FE-8C43695CDA60.jpeg
    8F9528BC-20E5-4F91-90FE-8C43695CDA60.jpeg
    316.4 KB · Views: 215
Progress is visible here, with more scaffolding removed, the hole in the podium is having its transfer slab poured again, and the north side of Phase 1 is close to topping out (2 more floors?)

868806A4-3486-430F-805F-DA1695F0D7CB.jpeg
C1A55E50-1040-40F7-86FF-7E7866D3E947.jpeg
93FF558F-B371-477B-BD1C-46E24197FA64.jpeg
9074B88A-B10F-4C41-B525-92F91A28E25D.jpeg
9E936387-039E-4DA8-BF35-F6942BF29F61.jpeg

The floor height is large here, Apple Store?!?! 😉
D32B9F02-3CA6-4CC3-B644-9A908B112DB5.jpeg
F1DFAC84-E08F-430D-B2A7-D64C2C739A1E.jpeg
AE7F0150-1143-4987-88F0-98C32A4A5EFF.jpeg


On another note, there is movement north of here. Seems to be excavating large amounts of soil off property; getting ready for future development by levelling the surrounding area/prepping for new road infrastructure/utilities?
C096FF72-DB45-424E-975B-12AAB5ED04F1.jpeg
329AFE53-10E1-42C3-BA6A-70537B0032C3.jpeg
 

Back
Top