Yes, the city plans show a skybridge connecting the shorter tower to the podium of the larger building. The bridge is on the north side of the site, over the laneway that will run through to Scollard. It's a fairly high bridge as well.
I'm confused. Which way is this tower facing? What is all that flat empty space on the eastern portion? Is that where the tower is going? Where is the podium? I'm confused.
I'm confused. Which way is this tower facing? What is all that flat empty space on the eastern portion? Is that where the tower is going? Where is the podium? I'm confused.
If you look at Drum's photo in post #1209 the building is photographed facing north-west with Yorkville Ave. in the bottom left hand corner, Bay Street (unseen) is about mid picture on the left. What your looking at in that photo is the podium and where the 55s will go, the empty space on the east side is where the yet to be started 25s tower will go.