Thanks for the reminder! My pic from Monday:
City Planning’s Dec 24, 2024 letter to COA recommends approval — GFA and setback reduction would come with a ~$18k financial contribution for Ward 9 improvements. https://www.toronto.ca/f885eb20-c451-4032-85d8-3ae724943210![]()
Application Details
www.toronto.ca
Minor Variance application proposing the following changes:
No new renderings. CoA hearing tentatively scheduled for Dec 4
- Total residential units increased from 135 to 162
- Total vehicular parking decreased from 40 to 34
- Total bicycle parking increased from 137 to 179
- Minor height increase from 28.75 to 30.14m
City confirmed via email last month no new date has bern scheduled.City Planning’s Dec 24, 2024 letter to COA recommends approval — GFA and setback reduction would come with a ~$18k financial contribution for Ward 9 improvements. https://www.toronto.ca/f885eb20-c451-4032-85d8-3ae724943210
The hearing was scheduled to occur on Jan 8 but the status is now “deferred.” Not sure what’s next.