In that top picture you can see how the trees beside the exchange towers south lot are quickly being removed.
 
In that top picture you can see how the trees beside the exchange towers south lot are quickly being removed.
Good eye. It has been completely stripped so is construction starting soon?
Here is a pic I took last October when it was in its natural state:
DJI_0637.JPG
 
Good eye. It has been completely stripped so is construction starting soon?
Here is a pic I took last October when it was in its natural state:
View attachment 402962
I always assumed that as soon as they were done on the north side that they would immediately move the construction equipment over to the south side. Some thought that there would be more of a gap to allow for the sales to happen. But the sales haven’t exactly slowed so I don’t see why they wouldn’t move on to construction as soon as they can.
 
Quick drive-by shooting on Sunday:

IMG_2787.jpg


42
 
June 12
The north tower fly forms being place for the grade level slab that will be in place in July with the south tower in Aug
52144975071_95cc95fdb9_b.jpg

52144974946_ffb3b9d23b_b.jpg

52145462730_defd102ac4_b.jpg

52145211954_9c2255c7f0_b.jpg

52144975466_0a77b27325_b.jpg

52144975516_4091136980_b.jpg

52144975656_1fe41e8f41_b.jpg

52145463205_a25f0c3a26_b.jpg

52144996773_a2e3530fa3_b.jpg

52143954222_85809cb809_b.jpg

52143954492_06b0190e2d_b.jpg

52145463910_e5a7f6ca21_b.jpg

52144976621_27516287f3_b.jpg
 