EX1:
-The 3rd stacked boxed is being poured.
-Scaffolding on the north side has been removed, revealing the cantilever from the 2nd stacked box.
-Installation of balcony glass and podium cladding has started.
-The 3rd stacked boxed is being poured.
-Scaffolding on the north side has been removed, revealing the cantilever from the 2nd stacked box.
-Installation of balcony glass and podium cladding has started.