No one should ever expect that they will occupy a unit when a developer gives the date. They are allowed to push the date multiple times and that’s basically what happens every time.
Exactly...occupancy for any of these buildings may start 2025.
 
Any activity yet on the other side for EX2 and EX3?

It is hard to tell which tower is called what but I assume you mean the two easternmost towers (yellow and blue tops) ? It is hard to tell from the ground but they have probably finished 1 or 2 underground levels on the south east corner (yellow short tower) and are still excavating the site for the tall blue capped one (still no crane there.)

This arial photo by @Tim MacDonald in early Jan is a great reference.

441CB976-3039-40A4-871C-BAB636CB84A4.jpeg
 
It is hard to tell which tower is called what but I assume you mean the two easternmost towers (yellow and blue tops) ? It is hard to tell from the ground but they have probably finished 1 or 2 underground levels on the south east corner (yellow short tower) and are still excavating the site for the tall blue capped one (still no crane there.)

This arial photo by @Tim MacDonald in early Jan is a great reference.

View attachment 456219
Yes youre right EX2 and EX3 are to the left, EX2 is in the back and looks underway with the crane, EX3 is in the front and is just doing grading
 