SimonP
Active Member
The enormous advantage of LRT is that it can also be run on the surface. That's where the big savings are. If we want the Eglinton line to connect to the airport, the cheapest way is to run it along the street. If we build a full subway, we either need to change modes at Jane or overbuild to extend a subway west. More money would be saved if we had stuck to the original plan and ran the LRT above ground through the Golden Mile, where there's plenty of capacity.




