It will likely be elevated through the valley and tunneled after Scarlett Rd.Considering that the section from Weston to the Humber is a massive floodplain, it would be illogical to tunnel there...
It will likely be elevated through the valley and tunneled after Scarlett Rd.Considering that the section from Weston to the Humber is a massive floodplain, it would be illogical to tunnel there...
I believe the hub will finish first. They say it'll be finished by 2027-2030 but I am skeptical of that.We don't exactly know where it will be tunnelled, Metrolinx has been mum on this. In one interview, Phil Verster did allude that it will be tunnelled past the Humber river, so I am going to go out on a limb and say the section immediately after Mount Dennis to past the Humber River will be elevated, but we don't know at this point.
As for the Pearson connection, my understanding is that Mount Dennis to Renforth will be built first, with the Pearson segment completed when the GTAA builds the transit hub/Union Station West. Without that project complete, the LRT has nowhere to go at YYZ.
It will likely be elevated through the valley and tunneled after Scarlett Rd.
I believe the hub will finish first. They say it'll be finished by 2027-2030 but I am skeptical of that.
I don't think they even finished designing it.Have they even started it?
I don't think they even finished designing it.
At the 29:56 mark the CEO of Metrolinx says they will be doing the tunnel contract for the Eg West LRT "this year".
Aren't you pro Scarborough subway?Sigh. Considering the width and highway-like nature of Eglinton west of Scarlett, there's zero reason to incur the astronomical costs of tunneling.
If we're lucky it'll be cut and cover.Sigh. Considering the width and highway-like nature of Eglinton west of Scarlett, there's zero reason to incur the astronomical costs of tunneling.
I'm still confused. Has the City agreed with the province on the number of underground stations? In other words, the scope of the route is locked down? Was that part of the Provincial-Municipal deal Council voted in favour of in 2019?
Remember when some people thought ripping up transit city for a new plan because of a couple of transfers (don mills, Kennedy) made a lot of sense.We’re going to waste billions tunneling this project, while also underfunding and underbuilding the Ontario Line to such a degree that we’re probably gonna end up spending billions more to fix it in 10 or 20 years. Unbelievable
Aren't you pro Scarborough subway?