Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

Honestly if simcoe street in Oshawa can get an underground lrt in order to preserve those heritage houses than surely in Toronto which lacks parks we should be going underground here.
You cannot put this underground in this area as its a floodplain and you would have to go very deep to get under the river that is there. Extra protection to the tunnel would be require. The idea was looked at and it required a floodgate at the east end to protect the system to the east. Even if the line ran on the surface, a floodgate was required.

Brussels Metro is only an LRT that runs both on the surface as well underground.
 
BBD84D77-6E93-464A-AA38-7E1311C812F5.jpeg
3191ABBE-1BF5-471E-9A42-61E165AD1042.jpeg
524D1DA9-A86E-4EB4-8EA7-55E9150546A9.jpeg
5EC71035-1A9B-4D01-B8C4-6182CD87A11B.jpeg
CF8F06F0-4790-44AC-8E78-AEE4E23DB9B4.jpeg
 
It will be quite ironic if Eg West - the most controversial of the four - gets completed earlier than OL, SSE, and Yonge North.
 
The tunnelling is making good progress, but wait until Etobicoke discovers how much fun multi-year disruptions for deep station excavations can be.

- Paul
 
The tunnelling is making good progress, but wait until Etobicoke discovers how much fun multi-year disruptions for deep station excavations can be.

- Paul
Luckily it won't be as bad as it was in Scarborough! split the north and half of the city for a whole summer
 
Here's a nice summary for you: The Crosstown West will not open before the rest of the Crosstown line.
The post you responded to didn't mention the rest of the Crosstown. It was referring to the Ontario Line, Line 2 extension to Sheppard, and Line 1 extension to Highway 7.
 
I thought there were a bunch of sewer and other infrastructure relocates that still needed to happen above some of the bored tunnels?
Good point, though I meant the major delays for the crosstown and the most visible impacts are from where the stations are being dug up to connect to the existing subway line.
 
I thought there were a bunch of sewer and other infrastructure relocates that still needed to happen above some of the bored tunnels?
And those are due for replacement in the coming years or decade and better to do it now than dig things up again down the road.

What is taking place at Yonge has turn out to be harder than plan for.. Its not only the building of the LRT station, but moving TTC line 1 access to it. Both Line 1 stations are the hold up for the line to open as well a few other things.

TTC has funding in their 2023 for operations budget for late this year for both Lines 5 & 6 with full funding for 2024.
 