Toronto East United Condos | 82.6m | 24s | SigNature | Giannone Petricone

5836438F-8877-411A-8D40-18DCDEFB6C4E.jpeg
 
  • Like
Reactions: PMT
Take a look at the quality of the concrete between these ghastly purple balconies. I was walking past today and it is VERY shoddy work. If it will be covered by more 'siding' (will it be??) I suppose it's OK but it is very low-quality.

Felt the same way when I was walking by last week.
 
The lower half of this building is particularly bad, but fortunately there is plenty of development potential all around that could eventually hide it from view.
 
Dec 15
More up om my site
They are about to start building a 1s addition to the building to the north that not connected with this project.
49232993593_c1b90f26ec_b.jpg

49233458951_efe0219d45_b.jpg

49233461851_025a768012_b.jpg

49232998013_907122a261_b.jpg

49233462981_327eaf4375_b.jpg

49233463316_a2496c699a_b.jpg

49232999418_8cf8e2620b_b.jpg

49233692387_326ed00fa3_b.jpg

49233694447_5948c9ccbb_b.jpg

49233694767_0d93af35a1_b.jpg

49233473566_ae4d6e27ae_b.jpg

49233697282_244aff2ca8_b.jpg

49233476886_7cd3408d9f_b.jpg

49233700872_c6496e1f34_b.jpg

49233478281_4ec1d93a12_b.jpg

49233017888_9437034dbf_b.jpg
 
If this is so they do not appear to have a building permit!
Was talking to the owner of the excavation company while I was shooting the west side who were doing a site visit and they were getting ready to start working
49232990458_ce8af20cc2_b.jpg
 
I can't remember seeing such a confused jumble of a material palette as in this project. There's like 5 different types of brick, laid and precast, copper tones, straight-up bold red vertical elements, transparent magenta and purple panels, aluminum panel system, standing seam panels, the list goes on. It's like the designer got bored and tried to design 5 different projects along the way.
 
The "brick" on the Parliament Street side looks worse than brick veneer on the Shoppers Drug Mart up the street. Truly atrocious in person.
 

Back
Top