On the agenda for the next Toronto Public Library Board meeting on November 16th, 2020 is the award of the architecture/design contract for the new (replacement) Dawes Road Public Library Branch.
Link here: https://www.torontopubliclibrary.ca...s-road-branch-architect-award-of-contract.pdf
The existing Branch is 6,500ft2 with 8 formerly occupied residential condominiums above it in a 3-storey building.
The new facility which will include additional land at 82 Chapman (currently a SFH) will be 20,000ft2, plus a 2,000ft2 community hub.
Additional community partners are continuing to be sought and its possible the facility will grow by a further 16000ft2
Community consultation will follow shortly, with schematic design scheduled to be complete in summer 2021, construction is currently scheduled for 2023.
****
This is the existing building: (from Streetview)
This is the sideview, revealing the existing apartments and the SFH on the left hand side of the picture, the land of which will be included in this redevelopment. (also from Streetview)
Aerial View below:
Link here: https://www.torontopubliclibrary.ca...s-road-branch-architect-award-of-contract.pdf
The existing Branch is 6,500ft2 with 8 formerly occupied residential condominiums above it in a 3-storey building.
The new facility which will include additional land at 82 Chapman (currently a SFH) will be 20,000ft2, plus a 2,000ft2 community hub.
Additional community partners are continuing to be sought and its possible the facility will grow by a further 16000ft2
Community consultation will follow shortly, with schematic design scheduled to be complete in summer 2021, construction is currently scheduled for 2023.
****
This is the existing building: (from Streetview)
This is the sideview, revealing the existing apartments and the SFH on the left hand side of the picture, the land of which will be included in this redevelopment. (also from Streetview)
Aerial View below: