M II A II R II K
Senior Member
I suppose the Line 2 TBMs will be called Toonie or Bloorey and Danny or some crap like that.
I suppose the Line 2 TBMs will be called Toonie or Bloorey and Danny or some crap like that.
Robbie and Douggie.
What's the status with the Eglinton Connects project? Just curious if they're still planning on going through with it? Funding??
Risk of the subway tunnel shifting.
Ok, so the problem will still have to be addressed on the future.
I'm not sure if it's a problem. I'm not an engineer, but it doesn't seem too big of an issue to shore the tunnel with steel beams and excavated while the subway is running.
It would have to be addressed in the future anyways. If you'd have kept tunnelling under the existing station, you'd still have had to have dug down to build the platforms and remove all the tunnel segments. And you'd have had to have been deeper under the existing track than if you did it the way they are planning.Ok, so the problem will still have to be addressed on the future.
Okay, is it just me or are TBMs supposed to be longer? Behind the cutterhead, I thought it was a whole assembly line of drilling and liner fitting equipment. Was this moved in smaller pieces?