Metroscapes
Active Member
Does anyone believe Mlinx are stalling opening the Eglinton LRT to line up with the opening of the Finch LRT? From an operational standpoint, might make more sense to redo all system maps in one shot as opposed to multiple updates over a 6 - 12 month period.
If anything, I thought it'd be the other way 'round: stalling the opening of Finch to line up with Eglinton.