I was looking through the
progress update that Metrolinx published after the media tour and found an image of the station layout. Took a bit to interpret, but I think I have the locations plotted correctly.
Mapping the street-level entrances:
The underground configuration seems different from what I've seen previously. In addition to the ECLRT concourse, there appear to be two smaller concourses (I've called them -2, West and -2, East), roughly at the level of Line 1 but not directly connected to it, and with their own fare gates. It seems that the Yonge Eglinton Centre and ePlace complex will connect to these instead of the existing concourse. The entrance at the CIBC on the SE corner is still connected.
Here I've highlighted two new escalators on the existing concourse, each descending to one of these mini-concourses.
And here I've highlighted a few more of the staircases and escalators:
So someone going from the Yonge Eglinton Centre to Line 1 could:
- Descend to (-2, West), ascend to the existing concourse, enter the fare gates, and descend to the Line 1 platform
- Descend to (-2, West), enter the fare gates, descend to the ECLRT concourse, and ascend to the Line 1 platform
I can only assume they've done this because of some issues with utilities under Eglinton Avenue? Because I don't see any other reason for these mini-concourses to exist so deep.