As someone who photograph over 200 project across the GTA yearly for some time, they all had cranes or a number of cranes on them at the same time that projects were delay coming out of the ground as there wasn't one for them. In the last few months, 50 projects have lost cranes or about to with a number of new projects breaking ground. Some are seeing cranes now. 2020 is going to be a slow year for cranes, but 2021 is going to be demanding one to see who gets one first.how do you know? do you work in the crane store?
Yeah we have a ways to go. Crown extends beyond the top of the core by a bit (~20m). I suspect the crown will use the same steel as the southern "towers" crown, so that will be a good indicator.Don't think the steel is topped out yet - it extends some way beyond the top of the concrete core - look back at Contra's diagrams.
That is for the mechanical room and elevator at the north end as well the shirting around the top, otherwise the main steel tower is top off.Don't think the steel is topped out yet - it extends some way beyond the top of the concrete core - look back at Contra's diagrams.
I don't think the date is public yet, but the opening Month sort of rhymes with broom.Is there a date for when metrolinx moves into the part of the building that is the new bus terminal? According to GO it says 2020 but gives no real date as to when the change will be. https://www.gotransit.com/en/the-future-go/improvements/union-station-bus-terminal
I don't think the date is public yet, but the opening Month sort of rhymes with broom.
June??