The counter-balance of the right-most crane is more-or-less the final height. From the drawings that will be open for the BMU (not sure if there will be an opening in the facade or it will be longer arm like L Tower).
 

skycandy

Senior Member
Member Bio
Joined
Mar 25, 2015
Messages
1,397
Reaction score
13,881
Location
South Riverdale
Noticed the cranes didn't seem to move much the last couple of days. And not sure if the howling winds prevented some work up top as well. But some activity seemed to resume as of this morning. In first zoom I picked out about half a dozen workers (as wee twinges of orange...two near the top corners north side, and two southern section near top plus a couple more).

CIBC1.jpg


CIBC2.jpg


CIBC3.jpg
 

mburrrrr

Active Member
Member Bio
Joined
Feb 9, 2010
Messages
429
Reaction score
4,385
AGGreko - looks like a temporary air cooled chiller delivered Saturday morning at 9:30.
B1D388FA-C015-46D2-8513-1D65AD80E622.jpeg


Installed Saturday or Sunday on the CIBC square podium lower roof.
AE2A4A47-A5BB-4BF2-A66F-6547317D90FA.jpeg

Probably cooling for the new lower level bus station at a minimum until the main chiller plant is up and running and/or for construction crews working in the greenhouse.

old picture from March 10th of the equipment location.
1C8DCB47-2130-4B93-A842-EC7EA4730460.jpeg

So sorry to our dear neighbours at 18 Yonge St.
The noise will probably be quieter than the trains pulling out of Union Station.

I guess the good news is that the GO Bus Station could be open before the cooling season is over?
 

vini007

Active Member
Member Bio
Joined
Dec 20, 2008
Messages
309
Reaction score
39
Location
parkdale
AGGreko - looks like a temporary air cooled chiller delivered Saturday morning at 9:30.
View attachment 242919

Installed Saturday or Sunday on the CIBC square podium lower roof.
View attachment 242918
Probably cooling for the new lower level bus station at a minimum until the main chiller plant is up and running and/or for construction crews working in the greenhouse.

old picture from March 10th of the equipment location.View attachment 242929
So sorry to our dear neighbours at 18 Yonge St.
The noise will probably be quieter than the trains pulling out of Union Station.

I guess the good news is that the GO Bus Station could be open before the cooling season is over?
Wow, 18 fans on that unit and was shipped from Scotland or we make it here?
 

Capslock

New Member
Member Bio
Joined
Jun 27, 2017
Messages
81
Reaction score
173
...and that is the final top of the steel! There might be another metre of glass above that, but that's all folks!

Yes it should have been taller, but it does look pretty good from that Bay Street view looking at the narrow end.
 

Top