Michael62
Active Member
Working on a rainy Saturday. The big news this week is the extended work on the platform running at ground level along Bay St. The formers created a flat platform from one end to the other and now they've added rectangular platforms on top. It divides the spaces making lower and deeper spaces between the added rectangular platforms The lower deeper channels between the rectangles match up with the soldier beams that were installed into the ground several weeks ago.
Looking towards the north wall, the smallest digger has just removed another section of the drain that ran east to west through the site. Along with the drain removal they have been removing a lot of timbers. Yesterday was the first clear indication that the timbers formed a supporting wall on the south side of the drain. If you look closely you can also see a small creek has formed, it runs from Bay St and turns towards the south. It runs through a plastic drain pipe under the ramp that accesses the lower level and then is pumped out into the blue and orange holding tanks. This creek may explain why there was originally a concrete drain running through the site.
Looking towards the north wall, the smallest digger has just removed another section of the drain that ran east to west through the site. Along with the drain removal they have been removing a lot of timbers. Yesterday was the first clear indication that the timbers formed a supporting wall on the south side of the drain. If you look closely you can also see a small creek has formed, it runs from Bay St and turns towards the south. It runs through a plastic drain pipe under the ramp that accesses the lower level and then is pumped out into the blue and orange holding tanks. This creek may explain why there was originally a concrete drain running through the site.