bowen
Active Member
Great photos, @Paclo
This warmer (for March) weather means the Corleck’s brick restoration work (by Trinity Masonry, who also built Ireland Park) is about to start back up. The exterior stair assembly you see in the foreground of Paclo’s shots will be installed in early April. And the east wing’s parapet will be rebuilt this Spring in order to support a railing for the future rooftop terrace.
We actually hosted our bidder’s meeting in the Corleck yesterday for the park construction. Excellent turn out. Call closes April 14. Looking at an early June 2023 ground breaking and Fall 2024 park opening with the Corleck. Photo: Boszko & Verity (GC for the Corleck).
Lastly, Deputy Mayor McKelvie hosted a media event last week to showcase the many waterfront improvement projects underway by the City, Waterfront Toronto and CreateTO. Great to have the silo property revitalization featured. Many puzzle pieces falling into place there this year.
This warmer (for March) weather means the Corleck’s brick restoration work (by Trinity Masonry, who also built Ireland Park) is about to start back up. The exterior stair assembly you see in the foreground of Paclo’s shots will be installed in early April. And the east wing’s parapet will be rebuilt this Spring in order to support a railing for the future rooftop terrace.
We actually hosted our bidder’s meeting in the Corleck yesterday for the park construction. Excellent turn out. Call closes April 14. Looking at an early June 2023 ground breaking and Fall 2024 park opening with the Corleck. Photo: Boszko & Verity (GC for the Corleck).
Lastly, Deputy Mayor McKelvie hosted a media event last week to showcase the many waterfront improvement projects underway by the City, Waterfront Toronto and CreateTO. Great to have the silo property revitalization featured. Many puzzle pieces falling into place there this year.